Measure
Bills and interval data. Twelve months is enough to start.
Commercial and industrial energy
Heat pumps, batteries and solar for commercial and industrial sites. We design, install and maintain the plant that moves a site off gas and onto clean, efficient electric systems.
The idea
Most commercial sites buy gas to make heat while their refrigeration and cooling dump heat outside. We recover that heat, make the rest with heat pumps, and run it all on solar and off-peak power.
Why it matters
From dairy country to city shopping centres, the job is the same: burn less gas, waste less heat and use more of the sun that already lands on the site.
Heat pump plant on a regional site, running on electricity instead of LPG.
Electric heating at a poultry shed.
Hot water, space heating and process heat moved from gas and LPG to efficient electric plant, with a planned changeover.
Heat rejected by refrigeration, cooling or effluent is upgraded and reused instead of being thrown away.
Solar and batteries sized to what the site can use, so more of its energy is generated and stored where it is needed.
What we engineer
Heat pumps, batteries, solar and the controls between them, sized to what the site can use and delivered by our own electricians.
Air or water source, including MVR, matched to the supply temperature. Waste heat at 25 to 35°C is lifted to 65 to 90°C on demand.
Battery energy storage sized to what the site can use, as part of the system rather than standalone.
Rooftop, carport and ground-mount generation, sized around your energy use, tariff and electrical capacity.
Heat pumps, storage and batteries planned 24 hours ahead from site data, tariffs and weather.
How a site system fits together
Pick a time of day to see which way heat, power and control signals move. Select any part of the system to see what we engineer there.
Site explorers
Live 3D models of the sites we work on. Drag to orbit, pick a technology, or start the tour and run the clock through a full day.
Who we work with
Large hot water, space heating or process loads, long operating hours, and cooling or refrigeration running alongside. Recovered heat means a smaller lift and a better COP, and storage evens out the peaks.
Delivered work
Supermarket, south-east Melbourne
Shopping centre, Melbourne
Cold storage, Brisbane
Selected work includes solar for Deepdene Primary School, battery storage for The Salvation Army and a 1.32 MW installation at Lineage, Cannon Hill.
How we work
Bills and interval data. Twelve months is enough to start.
Options and funding compared side by side, with certificates assessed alongside the design.
Plant, electrical and controls, designed together by the people who will install them.
Installed and commissioned by our own electricians under REC-36342.
Checked against design intent once the plant is running.
Monitor and maintain. We stay on the system long after handover.
Funding
Going solar, adding batteries or electrifying your site does not have to mean a big cheque upfront. We model ownership, finance, Energy-as-a-Service and PPA side by side.
In-house crews / plotted by coordinates
Coverage
In-house crews in Melbourne, Sydney, Brisbane, Adelaide and Cairns, with our workshop in Mitcham, Victoria. Founded by Christoph Beluz, mechatronics engineer, electrician and economist.
Send 12 months of energy bills, and interval data if you have it. We start there.