Data Centres | Modular data centres, designed and deployed | Geckon

Data Centres

Modular
data centres,
deployed.

Geckon designs and deploys modular data centres on sites with surplus electrical and physical capacity.

Concept imagery
Two formsContainerised modules and in-building modules.
Air and liquidCooling matched to the rack density each module carries.
One systemConnection, generation, storage, cooling and controls, engineered together.

Deployable products

Two module types. Built in the factory, landed on site.

Each module is assembled and tested before it travels, then connected to the power, cooling and controls prepared for it on site.

Containerised modules on a concrete pad beside a solar arrayConcept imagery
01 / CONTAINERISED

Containerised modules

Self-contained modules for yards, hardstand and unused corners of a site. Racks, power distribution, cooling and fire protection arrive inside one enclosure.

  • Placed outdoors on a prepared pad
  • Added in stages as load grows
  • Relocatable if the site changes
An aisle of server racks inside a data hall with overhead cable traysRepresentative image
02 / IN-BUILDING

In-building modules

Modular data halls fitted inside existing floor space, such as a warehouse bay or a plant area that is no longer used.

  • Uses the building already on site
  • Shares plant space, switchboards and roof area
  • Built from the same tested module design

Inside a module

Everything it needs, in one enclosure.

Select a part to see how it is specified. Figures are confirmed in design for each site, so we do not publish a single specification sheet.

Select any partIllustrative cutaway, not to scale

Modular or traditional

Built in steps, not in one go.

A modular data centre is assembled from tested units, so capacity follows demand.

Traditional buildModular build
Where it is builtOn site, as a single buildingIn a factory, tested before delivery
How capacity growsSized upfront for future demandAdded one module at a time
The siteA dedicated new siteA working site with spare capacity
If needs changeFixed for the life of the buildingModules can be relocated
The energy systemConnected after the building is designedDesigned with the modules from the start

The energy system around them

A data centre is an energy project first.

Six parts, designed as one system before a module is ordered. Select a part to see what we engineer there.

Aerial view of rows of modules beside a solar arrayConcept imagery
PowerHeatControlSelect any partIllustrative

Sites we deploy on

Working sites with capacity to spare.

The sites that suit a module already have a strong electrical supply, space in a yard or a building, and somewhere to use recovered heat.

A containerised module beside switchgear, a transformer and a solar arrayConcept imagery
01

Industrial

A large supply, hardstand and plant areas.

02

Cold storage

Heavy electrical infrastructure and large roofs.

03

Food processing

Steady demand for hot water and process heat.

04

Commercial

Unused floor space, plant rooms or car park area.

Delivery sequence

Seven steps, one accountable team.

01

Assess

Electrical capacity, space, structure and heat demand, measured on the site.

02

Design

Modules, power, cooling and controls designed together as one system.

03

Approvals and connection

Network connection application and the approvals the site requires.

04

Factory build and test

Modules are assembled and tested before they leave the factory.

05

Land

Pads, services and switchgear are prepared, then the modules are placed and connected.

06

Commission

Power, cooling, fire protection and controls are tested as a whole before load is applied.

07

Operate

We monitor and maintain the energy system after handover.

Experience

Electrical, mechanical, thermal and controls, in-house.

Delivered by our own engineers and electricians. Photographs are Geckon projects.

A row of battery energy storage cabinets being installed
STORAGE
5.7MWh

Battery energy storage

Shopping centre, Melbourne

Large commercial rooftop solar array
GENERATION
1.32MW

Solar hybrid system

Cold storage, Brisbane

Heat pump plant in an industrial plant room
THERMAL
330kW

Air-to-water heat pump

Supermarket, south-east Melbourne

IN-HOUSE

Our own crews

Engineers and electricians employed by Geckon design, install and commission the plant. Electrical work is delivered under VIC REC-36342.

NATIONAL

Crews around Australia

In-house crews in Melbourne, Sydney, Brisbane, Adelaide and Cairns, with our workshop in Mitcham, Victoria.

Contact

Tell us about the site.

Three things are enough to start: where the site is, how much capacity you have in mind, and when you need it.

This opens an email to Geckon from your own mail app, so we can reply to you directly.